Open Journal Systems

Issues Facing Implementation of Edo State Public Procurement Law in Construction Projects: Threat to Achieving Sustainable Development Goal 11

Mohamed Ahmed Hafez, Andrew Ebekozien, Godsent Ige Umaigba, Wellington Didibhuku Thwala, Zakaria Che Muda

Article ID: 3065
Vol 10, Issue 1, 2025, Article identifier:

VIEWS - 8 (Abstract) 0 (PDF)

Abstract

Studies showed that unethical practices in public procurement may hinder construction projects and economic development, particularly in developing cities and states, such as Edo State, Nigeria. The Nigerian Government enacted the Public Procurement Act (2007) to address the issues. Many states domesticated the Act, including Edo State (Edo State Public Procurement Law (ESPPL) 2020). However, implementation in some states may be challenging and can thwart achieving Sustainable Development Goal 11 (Sustainable Cities and Communities – SDG 11). This study investigated ESPPL implementation issues in construction projects and their outcome to Goal 11. It also proffered ways to boost implementation and, by extension, improve achieving SDG 11 and related SDGs. The researchers engaged knowledgeable respondents within Edo State, Nigeria, via a questionnaire survey approach. This study analysed the collected data with descriptive statistics. The results showed that the issues facing ESPPL implementation can hinder the achievement of Goal 11 if not curbed. As part of the study’s implication, the researchers proffered measures to mitigate the issues and, by extension, improved the achievement of Goal 11 and other SDGs related to construction project performance and excellence.


Keywords

Construction projects; Edo State; Issues; Public Procurement Act; Sustainable Development Goal (SDG) 11

Full Text:

PDF



References

1. Ebekozien A (2019). Unethical practices in procurement performance of Nigeria public building projects: Mixed methods approach. Theoretical and Empirical Researches in Urban Management, 14(3): 41-61.

2. Osunsanmi TO, Aigbavboa CO, Oke AE, Liphadzi, M (2020). Appraisal of stakeholders’ willingness to adopt construction 4.0 technologies for construction projects. Built Environment Project and Asset Management, 10(4). doi: 10.1108/ BEPAM-12-2018-0159.

3. Ebekozien A (2020). Corrupt acts in the Nigerian construction industry: is the ruling party fighting corruption? Journal of Contemporary African Studies, 38(3) doi: 10.1080/02589001.2020.1758304.

4. Weber B, Alfen HW (2016). Infrastructure as an Asset Class: Investment Strategies, Project Finance and PPP, John Wiley and Sons, New York, NY.

5. Bogue R (2018). What are the prospects for robots in the construction industry? Industrial Robot: An International Journal, 45(1): 1-6, doi: 10.1108/IR-11-2017-0194.

6. Olajide F, Deji R, Oluwaseyi A (2017). Assessment of challenges facing the effective operations of the Nigerian public procurement act 2007. International Journal of Economics, Commerce and Management, 3(11): 957-968.

7. Olusola OS, Oluwatosin OT, Agboola OH (2016). Nigeria's Public Procurement Law puissant Issues and Projected Amendments. Public Policy and Administration Research. 6(6).

8. Kanu SI, Benedict AO, Akuwudike HC (2020). Effectiveness of public procurement act (PPA) in curbing corruption in the public service in Nigeria. A study of selected MDAs in FCT, Abuja. International Journal of Management Sciences and Business Administration, 7(1): 42-58.

9. BMPIU (2020). A Manual on Public Procurement Reform Program in Nigeria, State House, Abuja, Nigeria.

10. Public Procurement Act. (2007). Public Procurement Act. Abuja, Nigeria: Federal Government of Nigeria.

11. Aliu AA, Olatubosun O, Ajayi DO (2022b). The public procurement reforms in Nigeria: Implementation and challenges. European Journal of Logistics, Purchasing and Supply Chain Management, 8(4): 53-61.

12. Dickson CN, Achanya JJ (2022). Measures to strengthen the public procurement act against contract scam in Nigeria; Lessons from policy implementation 2007-2015. Journal of the Management Sciences (JOMAS), 58(2): 1-13.

13. Familoye O, Ogunsemi DR, Awodele OA (2015). A Comparative Analysis of Nigeria Public Procurement Act 2007 with Selected International Procurement Acts. Paper presented at the Environmental Design and Management International Conference on Responsive Built Environment held at Faculty of Environmental Design and Management, Obafemi Awolowo University, Ile Ife, Nigeria, 173-182.

14. Vanguard. (2018). Corruption getting worse in Nigeria – Transparency International. Vanguard. Retrieved from https://www.vanguardngr.com/2018/02/corruption-getting-worse-nigeriatransparency-international/

15. Nicholas NI, Anthony OU, Christian UC (2021). Public procurement, transparency and accountability in Nigeria: Dissecting the benefits and challenges to anti-corruption. International Journal of Economics, Commerce and Management, 9(1): 306-323.

16. Adeyeye A (2014). Governance Reform and the challenges of implementing public procurement law regime across Nigerian states and local governments. International Journal of Public Administration and Management Research (IJPAMR), 2(4): 25-32.

17. Akenroye TO, Owens JD, Elbaz J, Durowoju OA (2020). Dynamic capabilities for SME participation in public procurement. Business Process Management Journal, 26(4): 857-888.

18. Umaigba IG (2023). Appraising Edo State public procurement Law 2020: issues facing implementation. Unpublished HND dissertation submitted to Auchi Polytechnic, Auchi, Nigeria.

19. Owusu EK, Chan AP, Ameyaw EE, Robert OK (2020). Evaluating the effectiveness of strategies for extirpating corrupt practices in infrastructure project procurement. Journal of Infrastructure Systems, 26(2), 04020004.

20. Musanzikwa M (2018). Public Procurement System Challenges in Developing Countries: The Case of Zimbabwe. International Journal of Economics, Finance and Management Sciences, 1(2): 119-127.

21. Olatunji SO, Olawunmi TO, Odeyinka HA (2016). Nigeria’s public procurement law: Pursuant issues and projected amendments. Public policy and administrative research, 6(6): 73-85.

22. Edo Public Procurement Law (2020). Edo State Government of Nigeria. Benin City, Nigeria: Edo State.

23. Adeniyi O, Ojo LD, Idowu OA, Kolawole SB (2020). Compliance with the stipulated procurement process in local governments: a case from a developing nation. International Journal of Procurement Management, 13(5): 678-700.

24. Moneke UU (2020). Assessment of success factors for partnering arrangement in construction industries for effective projects. Interdisciplinary journal of contemporary research in business (IJCRB) 1(1): 297-309.

25. United Nations (2022). Economic and social council. United Nations, available at: https:// sustainabledevelopment.un.org/content/documents/29858SG_SDG_Progress_ Report_2022.pdf.

26. Valencia SC, Simon D, Croese S, Nordqvist J, Oloko M, Sharma T, Buck TN, Versace I. (2019). Adapting the sustainable development goals and the new urban agenda to the city level: initial reflections from a comparative research project. International Journal of Urban Sustainable Development, 11(1): 4-23.

27. Ebekozien A, Abdul-Aziz A.R, Jaafar M (2021a). Low-cost housing policies and squatters in Nigeria: the Nigerian perspective on possible solutions. International Journal of Construction Management, 21(11): 1088-1098, doi: 10.1080/15623599.2019. 1602586.

28. Ebekozien A, Aigbavboa C, Aigbedion M (2021b). Construction industry post- COVID-19 recovery: stakeholders perspective on achieving sustainable development goals. International Journal of Construction Management, pp. 1-11, doi: 10.1080/15623599.2021.1973184.

29. Sustainable Development Goal Indicators (2016). Report of the inter-agency and export group on sustainable development goal Indicators (E/CN.3/2016/2/Rev.1).

30. Sukamolson S (2007). Fundamentals of quantitative research. Language Institute Chulalongkorn University, 1(3): 1–20.

31. Aliu J, Aghimien D, Aigbavboa C, Oke A, Ebekozien A, Temidayo O (2022). Empirical Investigation of Discipline-Specific Skills Required for the Employability of Built Environment Graduates. International Journal of Construction Education and Research. https://doi.org/10.1080/15578771.2022.2159589.

32. Ebekozien A, Aigbavboa C, Thwala DW (2025). A practical research process for developing a sustainable built environment in emerging economies. New York: Routledge - Taylor and Francis Group.

33. Hair JF, Black WC, Babin BJ, Anderson RE (2010). Confirmatory factor analysis. In Multivariate data analysis 7th. Pearson Education, Inc. pp. 600–638.

34. Ticehurst GW, Veal AJ (2000). Questionnaire surveys. Business Research Methods: A Managerial Approach, 135–158.

35. Basheka BC (2021). Public procurement governance: toward an anti-corruption framework for public procurement in Uganda. Public procurement, corruption and the crisis of governance in Africa, 113-141.

36. Akaba TI, Norta A, Udokwu C, Draheim D (2020). A framework for the adoption of blockchain-based e-procurement systems in the public sector: A case study of Nigeria. In Responsible Design, Implementation and Use of Information and Communication Technology: 19th IFIP WG 6.11 Conference on e-Business, e-Services, and e-Society, I3E 2020, Skukuza, South Africa, April 6–8, 2020, Proceedings, Part I 19 (pp. 3-14). Springer International Publishing.

37. Ogunsanya OA, Aigbavboa CO, Thwala DW (2016). Challenges of construction procurement: a developing nation’s perspective. In proceedings: International Conference of Socio-economic Researchers (ICSR) 2016, Serbia.

38. Kushairi MRR (2019). An Organisational Approach to Sustainable Public Procurement. International Journal of Procurement Management, 12(3): 298-320.

39. Larbi BO, Baiden BK, Agyekum K (2019). Compliance with transparency provisions in the Public Procurement Act, 2003 (Act 663). International Journal of Procurement Management, 12(1): 112-133.

40. Changalima IA, Mushi GO, Mwaiseje SS (2021). Procurement planning as a strategic tool for public procurement effectiveness: Experience from selected public procuring entities in Dodoma city, Tanzania. Journal of Public Procurement, 21(1): 37-52. https://doi.org/10.1108/JOPP-05-2020-0047

41. Organisation of Exporting Countries and Development (OECD). (2017). Integrity in Public Procurement Good Practice from A-Z.

42. Aduwo EB, Ibem EO, Afolabi OA, Oluwnmi OA, Tunji-Olayeni FP, Ayo-Vaughan AE, Uwakonye OU, Oni AA (2020). Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria. Construction Economics and Building 20(1): 56-76.

43. Saastamoinen J, Tammi T, Reijonen H (2018). E-procurement and SME involvement in public procurement of innovations: an exploratory study. International Journal Procurement Management, 11(4): 420 – 442.

44. OECD. (2016). Preventing Corruption in Public Procurement. [online] Available at: www.oecd.org/gov/ public-procurement/. [Accessed 30 August 2024].

45. World Economic Forum. (2016). Partnering Against Corruption Initiative - Infrastructure and Urban Development. Geneva. Available at: www3.weforum.org/docs/WEF_PACI_IU_Report_2016.pdf. [Accessed 28 August 2024].

46. Afolabi A, Ibem E, Aduwo E, Tunji-Olayeni P, Oluwunmi O, Ayo-Vaughan E (2022). Gauging parameters for e-procurement acquisition in construction businesses in Nigeria. International Journal of Construction Management, 22(3): 426-435.

47. Jacob OA (2018). Procurement Law in Nigeria: Challenge for Attainment of its Objectives" University of Botswana Law Journal, 2(1): 1-8.


DOI: https://doi.org/10.59429/esp.v10i1.3065
(8 Abstract Views, 0 PDF Downloads)

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Mohamed Ahmed Hafez, Andrew Ebekozien, Godsent Ige Umaigba, Wellington Didibhuku Thwala, Zakaria Che Muda

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.